
After several pilot projects and the standardization of our processes, we focused on rolling out the project to all plants in the Business Area (BA). The integration of data collection and analysis, VR/AR applications, AMR integration, and simulation applications led to over 50 simulations being conducted in 2023/24. Due to the high workload in the field of simulation (Line Simulation = Tecnomatix Process Simulation / Factory Simulation = Tecnomatix Plant Simulation), we launched a new project aimed at increasing efficiency in the Simulation Department by integrating the Manufacturing Backbone into our processes.
Speaker: Jakub Hamernik, Continental Automotive
Key takeaways
- Continuous improvement in Manufacturing processes (Simulation, PLM, Digitalization)
- PLM system is a data platform for cooperation in the continental organization (Industrial Engineering)
- WEF Lighthouse evaluation, two use cases relevant to the simulation application